Login 
NESHANIC RIVER WATERSHED RESTORATION PLAN
 Home   About Watershed   About Project   Media Connections   Pictures 
PROJECT TASKS

Task 4: Conduct stormwater infrastructure inventory.

The stormwater infrastructure includes detention basins, best management practices, catch basins, piped drainage, ditches, outfalls to streams and ditches, culverts, diverters (also known as off-shoots and turn-outs), and others. A field inspection of all roads and streets (including developments) in the watershed and any known or suspected stormwater infrastructure (facility/structure) will be conducted. The location of condition of each facility/structure will be recorded. All information will be compiled into ArcView GIS files. A list of structures/facilities that require maintenance or need some type of retrofit will also be developed. The information from this inventory will be used to quantify the impacts of the stormwater runoff on water quality and develop the management measures to reduce the pollutant loads from storm runoffs.

The Hunterdon County Soil Conservation District will be responsible for this task.

Progress and Status:

 

Results and Outcomes:

 

<< Back to Overveiw
PROJECT CALENDAR: April 2007
Sun Mon Tue Wed Thu  Fri  Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
 
EVENTS >
Mar 28: Neshanic River Watershed Restoration Planning Committee Meeting in Flemington, NJ.
 
 
RELATED WEBSITES >
U.S. Environmental Protection Agency (EPA)