Login 
NESHANIC RIVER WATERSHED RESTORATION PLAN
 Home   About Watershed   About Project   Media Connections   Pictures 
PROJECT TASKS

Task 5: Evaluate stormwater management measures.

A database of the existing and potential management measures to reduce pollutant loads from stormwater runoff and other municipal sources will be compiled. Additional potential management practices to reduce the pollutant loads from stormwater runoff and other municipal sources will be reviewed and selected from the NJ Stormwater BMP Manual (NJDEP, 2004). The examples of such measures are constructed wetlands, bio-retention systems and so on. NJ Stormwater BMP Manual documented the potential impacts of some management measures on some pollutants. Literature will be reviewed to evaluate the expected pollutant load reductions of various BMPs. The biophysical modeling will be also used to estimate pollutant load reductions of those management measures in different landscape settings and weather conditions. The implementation costs for these management measures will be estimated from literature. If some data are not available, construction cost will be estimated based upon standard engineering procedures.

The University of Rutgers Cooperative Research and Extension will be responsible for this task.

Progress and Status:

 

Results and Outcomes:

 

<< Back to Overveiw
PROJECT CALENDAR: April 2007
Sun Mon Tue Wed Thu  Fri  Sat
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
 
EVENTS >
Mar 28: Neshanic River Watershed Restoration Planning Committee Meeting in Flemington, NJ.
 
 
RELATED WEBSITES >
U.S. Environmental Protection Agency (EPA)